Al-Shaheed Park Opens Its Third Phase in October: Skating, a Cinema and 2,388 Parking Spaces

An ice rink, a snow games hall, a Roman-style theatre and an open-air screen across 243,000 square metres. The numbers, and what changes on the ground.

Now 3 min read
Al-Shaheed Park Opens Its Third Phase in October: Skating, a Cinema and 2,388 Parking Spaces

An ice rink, a snow games hall, an electric car racing track, a Roman-style theatre and an open-air cinema. This is not a wish list but the contents of Al-Shaheed Park’s third phase, opening on Thursday 1 October.

The numbers

The project covers 243,605 square metres, distributed as follows:

  • 190,661 square metres of green space.
  • 16,232 square metres for investment activities.
  • 2,388 parking spaces.

The remainder, some thirty-six thousand square metres, is buildings and walkways. The source gave another figure for built area that does not reconcile with the total, so we have left it out.

The parking figure is the one that deserves the most attention. Anyone who has visited the park on a Friday evening knows the problem was never the park itself but getting to it.

What will be there

Alongside the above:

  • The Sour theatre complex, holding the Roman theatre, the outdoor cinema and a multipurpose hall.
  • A women’s health club.
  • An ice rink and a museum.
  • A flight ride.
  • The upper garden.
  • A mosque.
  • An open-air theatre.
  • Outdoor games, a running track and fountains.
  • Cafes and shops.

Who announced it

The presentation was given by Sheikh Abdulaziz Al-Mishal, undersecretary of the Amiri Diwan, before the Council of Ministers, and covered the project’s final phases. So this is not a leak or a marketing announcement but an official presentation to cabinet.

An opening carnival comes with it, with entertainment programmes, musical performances, light shows and activities for families and children.

What changes on the ground

Al-Shaheed Park today is a place you walk in. The third phase turns it into a place you spend the whole day in: skate, watch a film in the open air, run, pray, eat, then leave.

And what stands out is that most of what has been added is built for the heat: ice skating and a snow games hall are cooled indoor entertainment. The park is trying to stay usable in the months when nobody goes outside.

Update, 30 September 2026

The opening now has a date. The ceremony is on the evening of Wednesday 30 September 2026 at eight o’clock, at the Al-Sour theatre inside Al-Shaheed Park, and includes the national celebratory performance «Al-Sour». His Highness the Amir, Sheikh Meshal Al-Ahmad Al-Jaber Al-Sabah, is its patron, attended by his representative, His Highness Sheikh Ahmad Abdullah Al-Ahmad Al-Sabah, the Prime Minister.

Update, 1 October 2026

It is open. The ceremony took place on the evening of Wednesday 30 September at the Al-Sour theatre, with the Prime Minister, His Highness Sheikh Ahmad Abdullah Al-Ahmad Al-Sabah, attending as the Amir’s representative, and the national operetta «Al-Sour» performed.

So everything described above is now something you can go and see, rather than something to wait for.

Photo: by Zs.84 via Wikimedia Commons, CC BY-SA 4.0. The photo is of the existing phase, not the extension.

Further reading: Times Kuwait, 19 August 2026; Al-Jarida, citing KUNA, 29 September 2026; Al-Rai, 1 October 2026

Read also: Al Shaheed Park: two museums under the grass, on the line of the old city wall.

Kuwait One, once a week.

The most useful stories we published this week, in your inbox.

No spam. Unsubscribe anytime.

AdTothiq — Web, Mobile & Ecommerce Builds

Leave a comment

Your email will not be published. Comments are reviewed before they appear.